![]() Officials expect to open 18 security lanes to service the 39-gate facility, which will replace the airport’s current configuration with gates spread across separate terminals. The terminal will include two concourses attached by a 634-foot connection with moving walkways above and baggage handling systems below. Much of the framing work is taking shape and the 6,000-spot parking garage is beginning to rise directly in front of the new building. The New Single Terminal and Parking at Kansas City International Airport (MCI) project consists of a 1 Million square foot terminal facility including curbside, ticketing lobby, TSA compliant security screening checkpoint, TSA compliant in-line Checked Baggage Inspection System and associated support areas, baggage claim areas, baggage make-up area and associated support functions.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |